Swimming Pool Permit Package

To complete the paper version of this form, click here

Requirements for Swimming Pool Permit Applications

  1. All sections of the application filled out completely
  2. Contractor's License Information
  3. Complete plot plan showing showing all existing and proposed conditions (including dimensions of house, driveway, service walks, patios, sheds, etc
  4. If there is an existing fence on the property, height, gate swing direction, type and style of fence must be detailed to confirm compliance with barrier requirements for swimming pools
  5. For in-ground pools, a complete topography plan signed by an engineer/architect
  6. Complete construction details for all types of pools with list of materials being used
  7. Storm Water Management proposal for all pools over 500 square feet in size

Pool Permit Application

Code Enforcement Department

TO THE BOARD OF COMMISSIONERS OF SPRINGFIELD TOWNSHIP:
I (We) hereby apply for a permit to construct the following work (give exact location)
Distance from Water's Edge to the Following Property Lines:

Excavation and Filling of Ground Permit

Stormwater Management Permit

Application is hereby made for review of the SWM Site Plan and related data as submitted herewith in accordance with the Springfield Township Stormwater Management Ordinance. 

Plans

New/Replacement Impervious Coverage (between 500 square feet and 999 square feet)
Disturbance Limit (between 5,000 square feet and 1 acre)
New/Replacement Impervious Coverage (1,000+ square feet)
Limit of Disturbance (1+ acre)

Project Information

Schedule of Work:

Permit Terms and Conditions

1. I agree that I will comply with all Ordinances, laws and Township policies regulating grading, land disturbance, erosion/sedimentation control, and storm water management.
2. I agree to allow access to said activities for inspection by Township of Springfield Code Officer and Engineer.
3. All erosion/sedimentation control measures will be installed before land disturbance activities begin and be properly maintained throughout the grading/land disturbing activities. 1 further agree to add any additional erosion/sedimentation control measures as requested by Springfield Township.
4. I agree that I will be responsible for any damage to any utilities, public right-of-way and city streets caused by this work.
5. PERMIT FEE COVERS ONE (1) HOUR ENGINEER REVIEW TIME, ONE(l) SITE VISIT BY CODE OFFICER AND ADMINISTRATIVE COSTS. I AGREE TO PAY FOR ADDITIONAL ENGINEERING REVIEW FEES AND SITE VISITS AS REQUIRED.

Fence Permit Application

Lot Features:

Application for Electrical Permit

Item
Number
Ceiling Outlets
Switches
Plug Receptacles
Total Outlets
Air Heaters
Ranges
Signs
Water Heater
Lighting Circuits
Other Circuits
Total Circuits
Motors

Parties Involved

Not withstanding the issuance of this permit, all provisions of the Building and Zoning Codes will be complied with, whether specified herein or not.
Upload
Use the Drawing Tool to Sign Your Name in the Box Below

Payment Information

Payment of fees for this application will be requested via email once your submission has been reviewed.  Please verify that emails from donotreply@springfielddel.co are not sent to your spam/junk mail folder.  The email will contain a link to this form allowing you to make a secure payment by credit card.